NEW-CONSTRUCTION INSULATION // DFW

Texas summer
finds every gap.

A thermal view of an uninsulated living room in July. ARTEN installs batt, blown-in & BIBS insulation for new-construction builders across Dallas–Fort Worth. Scroll and watch what we do to this room.

SCROLL TO SEAL
DIAGNOSIS

84° inside.
AC on overtime.

Un-insulated cavities, a 130°+ attic overhead, and air leaks at every frame. Heat pours in faster than the system can pull it out.

TREATMENT

Batts. Blown. BIBS.

Installed and air-sealed before the drywall goes up: full-contact fit, spec-depth coverage, documented R-values.

RESULT

72° that holds.

A sealed envelope means smaller HVAC loads, lower bills, quieter rooms, and buyers who feel the difference at the walkthrough.

KEEP SCROLLING
Field report // North Texas summer

The envelope is the first HVAC decision you make.

Every uninsulated cavity and unsealed gap becomes a permanent load on the mechanical system. We treat insulation as building science, not a commodity line item, because the thermal image above is what your buyers pay for every month.

130°F+
Typical North Texas attic on a 100° afternoon, radiating straight into the ceiling below it.
15%
Average heating & cooling savings from air sealing plus insulation, per EPA ENERGY STAR estimates.
R-38–49
Attic spec we blow to: metered, depth-carded, and documented for inspection.
Insulation systems // one sealed envelope

Batt, Blown-In & BIBS Insulation

WALLS · CEILINGS · FLOORS · SOUND

Batt
Insulation

R-13 / R-15 · 2×4  |  R-19+ · 2×6

Fiberglass batts, cut and fit like they matter.

  • Precision-cut, split around wiring & plumbing: no compression, no voids
  • Friction-fit full contact on all six sides of the cavity
  • Fast, clean, and ready for insulation inspection
CAVITY FILL PROFILE
SEGMENTED FIT // QUALITY LIVES IN THE CUTS
ATTICS · HARD-TO-REACH CAVITIES

Blown-In
Insulation

R-38–R-49 · ATTIC DECK

Loose-fill coverage with no seams and no shortcuts.

  • Machine-metered fiberglass or cellulose at spec depth
  • Depth cards and coverage verified across the full deck
  • Baffled at the eaves so ventilation keeps working
DECK FILL PROFILE
SEAMLESS BLANKET // EVERY LOW SPOT COVERED
WALL CAVITIES · PREMIUM SPEC

BIBS
System

~R-15 · 2×4  |  ~R-23 · 2×6

Blow-In Blanket System: netted, dense-packed fiberglass.

  • Completely fills around pipes, wires, and boxes
  • Higher effective R-value than batts in the same cavity
  • Dense-packed, so it will not settle or slump
CAVITY FILL PROFILE
100% FILL BEHIND NETTING // ZERO VOIDS
Built for production builders

We keep your critical path moving.

New construction is what we do, not a sideline. Our crews are sized for communities and phases, our paperwork is sized for your inspector, and our schedule discipline is sized for superintendents who don’t like surprises.

EXTERIOR WALLSATTICSGARAGE CEILINGS SOUND BATTSAIR-SEAL PACKAGESMULTI-PHASE COMMUNITIES
BUILDER SPEC SHEETAMI-04
  • Pre-drywall scheduling, locked to your frame walkSTANDARD
  • IECC / North Texas amended R-values, documentedSTANDARD
  • Air-sealing at plates, penetrations & windowsSTANDARD
  • Insulation inspection sign-off, first passTARGET
  • Clean cavities: scrap out, jobsite sweptSTANDARD
  • Crew capacity for multi-lot phasesSCALED
From frame walk to sign-off

Four steps. No callbacks.

Walk & takeoff

We walk the frame, measure the real conditions, and price from plans or field, fast enough to keep your bid cycle moving.

Air-seal

Plates, penetrations, and window rough openings sealed first. Insulation without air-sealing is a filter, not a barrier.

Install

Batts, blown, or BIBS: the right system per assembly, installed to manufacturer spec at documented R-values.

Inspect & certify

We’re on site for the insulation inspection and hand over the coverage documentation your file needs.

BIDDING A PROJECT?

Send us
the plans.

Single lots to full phases across Dallas–Fort Worth. Takeoffs back fast, crews that show up when the schedule says, and an envelope that scans like the end of the video above.